Do you have a three-phase connection? Your inverter does not have to be three-phase. A 5 kW single-phase hybrid inverter on one phase works fine in Flanders, and is often cheaper. The reason lies in how the Fluvius digital meter counts.
The meter adds up the three phases
The digital meter measures each phase separately, but only registers the total. Fluvius says so itself: the meter first adds up export and import across the phases, and only then does the import or the export register move forward. So both never run at the same time.
L1: −3 kW · L2: +1.5 kW · L3: +1.5 kW → together 0 kW. The meter stands still: no import, no export.
See it in action
The inverter supplies 3 kW on L1. The house uses 1.5 kW on L2 and 1.5 kW on L3. Per phase: L1 −3.0, L2 +1.5, L3 +1.5. Together: 0 kW, so no import and no export.
More sun than consumption: −4.5 + 1.5 + 1.5 = −1.5 kW. The meter registers 1.5 kW of export. With a home battery, that surplus goes into the battery first.
No sun: everything comes from the grid. 0.5 + 1.5 + 1.5 = 3.5 kW import. With a battery, the inverter supplies that power on L1 in the evening and the meter adds it up again.
from the solar panels from the grid no current
Physically, the solar power on L1 flows out to the grid, and the power for L2 and L3 comes from the grid. But for your bill, and for the capacity tariff, only the sum counts. In the example you pay nothing, just as if everything were on the same phase.
When is a single-phase inverter enough?
- For normal household consumption, up to about 6,000 kWh per year.
- Up to about 16–18 solar panels (a 5 kW inverter, 8 kWp maximum).
- If you don’t have an electric car that needs to charge fast.
Under the Synergrid rules (C10/11), at most 5 kVA of generation may be connected on a single phase. That is why we always use a 5 kW inverter on single-phase, with an extra three-phase energy meter so that the inverter and battery see the sum of all phases.
When is three-phase better?
- With an electric car: a charger needs 7 to 11 kW, more than a 5 kW inverter can supply.
- With high consumption, many panels, or if you also want to shave peaks above 5 kW.
- If you have an existing installation of more than 8 kWp.
In our system calculator you see both options side by side on a three-phase grid: Budget (single-phase 5 kW) and Powerful (three-phase 10 kW), with the price. Not sure? Send a photo of your meter box and your quarter-hour data from Mijn Fluvius, and we’ll work it out for you.
Source: Fluvius, frequently asked questions about the digital meter.